Discover a premier Tier III datacenter facility, established in 2008, boasting an impressive 100% uptime over the last decade. This state-of-the-art property centrally hosts all legacy WY applications, providing seamless operations and management. Designed for reliability, it features fully redundant electrical circuits, cooling systems, uninterruptible power supplies (UPS), and network connections. A single diesel KVA generator ensures backup power, while free cooling capabilities maximize energy efficiency throughout most of the year. Security is paramount in this facility, with no regular occupancy or windows to deter intrusions. Advanced security measures include motion detection, key card access control, and comprehensive surveillance, with real-time monitoring alerts sent via text and email. The entire building is automated through Electro Controls. Call Scott Strellnauer (406) 249-3557, David Stone (406) 250-7249, or your real estate professional.
Listing Details
- UseBuildingLand
- Year Built2008
- Lot Size1.6510
- Zoning7